August 04th: Final inspection

Between 1 pm and 1.45 pm the appointment with the building inspector has been scheduled.

Did the supervisors do a good job?









YES, a very good job!

The inspector just checks the GFI outlet outside. Furthermore he checks if Juergen has installed the gadget by which the fuse for the rolldown shutters may be locked in the "OFF" position (see April 04th).

Then he signs the permit and leaves after about 5 min.

August 04th: Gutters

After the positive result of the final inspection Juergen starts the gutter work.

The blood spots on the floor result from Juergen drilling into his fingers instead of the gutter.

An der vorderen Ecke ist erst einmal Schluss. Jürgen muss jetzt seinen Ellbogen schonen, deswegen hat Maria ihm Arbeitsstopp für die restlichen Tage verordnet.

Home





If you rollover with the mouse (NOT click)
you get information about the work done on that date.

If you click on the date the page for that day opens!

Gallery of the individuell working stages



later

February

March

April

May

July

August

MO

TU

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28


MO

Tu

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

MO

TU

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31