Now, as he has taken care of all cavities in the stucco, Juergen installs the last shutter in front of the patio doors.
At first the box and the tracks are screwed to the wall ... |
... then the shutter is threaded into the tracks ... |
... and at last the cover of the box is screwed on. |
|
|
|
Now all rolldown shutters are installed:
Manual overrides: |
Hidden screws |
Ready! |
|
|
|
If you rollover with the mouse (NOT click)
you get information about the work done on that date.