April 6th: Insulation Inspection

Maria has scheduled the ceiling and wall insulation inspections (2 different inspections!).

Around 10.00 am our inspector Kent comes by to check if the insulation installation is per code.

This time we pass without any change requests. He signs both inspections and off he drives. These inspections are our favorites.




Permit as it is displayed beside our entrance




April 6th: Preparing the shutters

The rolldowns came in parts, i.e. Juergen has to assemble the tracks, the box, the shaft, the motor and the shield.

Juergen assembling the box and the tracks:

The next step is to measure the exact length and width
before screwing them to the wall:




April 6th: Soffits

Before Juergen closes his "workshop" today he gives the soffits a first try.

Our construction plans specify that we have to install vented aluminum soffits. The fascia will be installed later on along the roof edge:

Exempt from the construction drawing:




And in case we decide later on to install little recessed spots in front of the patio doors Juergen prepares
cables for them:

Measuring the cable:

Preparing the cables:

We will connect the cables only if we install some lights.

Home





If you rollover with the mouse (NOT click)
you get information about the work done on that date.

If you click on the date the page for that day opens!

Gallery of the individuell working stages



later

February

March

April

May

July

August

MO

TU

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28


MO

Tu

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

MO

TU

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31