Today Juergen will hang up the shutter boxes and tracks.
He even manages to completely install the one in front of the casement window. Only the connection to the power has to be done tomorrow.
|
![]() |
|
Rolldown in front of the patio doors:
Unfortunately we realised that the stucco guy has not plastered straight. The band to the right is crooked, i.e. the side to the door is sticking out (top edge is 1-3/4", bottom edge is 2-1/2"). The result: the shutter is stuck there and gets scratched on the back.
We call and mail Mark accordingsly and hope that he has a solution.