Juergen is done with installing the electrical boxes and conduits finally. Now it is time to pull the cables through the conduits and into the boxes.
But our first stop is our favorite DIY store, the Homedepot. It is unbelievable how many feet of cable are necessary for such a small room!
The most uncomfortable part of that work is to connect the main cables of Maria's Art Studio with the breaker box in the garage via the attic. And, believe me, that is hot up there, about 40° - 45° C (112 -120 F) during the day.
There is only the solution to get up early in the morning and have a quick breakfast to be ready with that work at about 10.00 am.
After that: cool down in the pool and have a shower (to shower before such a sweaty work would be a waste of water).
A few impressions how the cables are installed on the trusses:
If you rollover with the mouse (NOT click)
you get information about the work done on that date.
If you click on the date the page for that day opens!
February |
March |
April |
May |
|
July |
August |
|