Today we may sleep a little bit longer:
The Concrete Guy Billy Hart Bill Hart
6751 Staley Farms Road
Fort Myers, FL 33905-6925
Phone: (239) 229-2918
will start at 8.30 setting the molds for the tie beam.
The same as with the slab the horizontal iron rods have to be connected with the tie beam of the house: |
(to enlarge please click) |
After the molds have been nailed to the wall they are secured by frames to ensure that the concrete does not bent them outwards: |
|
You can find control openings allover these places where the concrete has to fill the wall: |
If you rollover with the mouse (NOT click)
you get information about the work done on that date.
If you click on the date the page for that day opens!