As the inspection was passed the tie beam of Maria's Art Studio will be poured today.
In the morning at 8.30 the first workers appear and at 8.30 it all starts: the concrete truck gets connected to the pump, let's go!
One guy holds onto the hose, one pours the goop and the third smoothes the top of the concrete:
Following the tie beam the little slab for the patio area beside the addition is poured:
The molds are prepared... |
... now the concrete is poured ... |
... afterwards everything is getting smoothed ... |
... and here you can see the result: |
|