February 11th: Inspection of the tie beam molds (Tie Beam 006)

Today is the tie beam inspection scheduled.

A building inspector has to check the number of irons and if they are connected to the tie beam of the house before the tie beam of the addition may be poured.

The Inspector calls Billy to inform him that more of the control opening have to be drilled on eyelevel before he pours the concrete. This is to ensure that the concrete flow is not plugged on the way down without him being aware of that.

Furthermore he wants to get more detailled specification of the tie beam from the design engineer who sealed the technical drawings.

But still we pass the inspection without any remarks.

Home





If you rollover with the mouse (NOT click)
you get information about the work done on that date.

If you click on the date the page for that day opens!

Gallery of the individuell working stages



later

February

March

April

May

July

August

MO

TU

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28


MO

Tu

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

MO

TU

WE

TH

FR

SA

SU

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31


MO

DI

MI

DO

FR

SA

SO

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31