Now, as he has taken care of all cavities in the stucco, Juergen installs the last shutter in front of the patio doors.
|
At first the box and the tracks are screwed to the wall ... |
... then the shutter is threaded into the tracks ... |
... and at last the cover of the box is screwed on. |
|
|
|
|
Now all rolldown shutters are installed:
|
Manual overrides: |
Hidden screws |
Ready! |
|
|
|
|