After we passed the dry-in inspection yesterday Roberto and his guy come around at 8.00 am to install the shingles:
Yesterday Patrick and Juergen framed all window and door openings, sealed them to be waterproof and put up the windows and French doors without nailing them yet.
|
Juergen's work will be today to nail the window flanges down to the wooden frame: |
|
As Maria would like to have archtop openings it is necessary to build a frame as underconstruction for the stucco.
The windows within their frames:

In several steps the outer frame for around the top of the windows is built:
|
First grades are cut into a 2x4 stud, distance between grades: 5mm (about 3/16'), 7-8 mm (about 5/16') remain uncut ... |
... then these cut studs are bended and glued to the ready frame of plywood ... |
... here you can see the grades in detail: |
|
|
|
And that is the result after installing this created frame:

If you rollover with the mouse (NOT click)
you get information about the work done on that date.
If you click on the date the page for that day opens!
|